Venta
Casa
Caleta de Vélez
274.900€
Impuestos y gastos pueden no estar incluidos
M²
152
Dormitorios
2
Baños
2
Característica
2
2
1
Casa
estado
Con 152m² construidos
Descripción: Casa con 152m²construidos, 2 dormitorios, 2 baños, 1 garaje/s, estado, ...
Green 9 Cool, a new development with a functional and distinctive concept of design located at the eastern end of the Costa del Sol. This ultra_modern design is inspired as well by the surrounding nature and sports environment, right next to Baviera golf course, and just two minutes away from the beach and the Marina at Caleta de Velez. Designed over 2 floors to be completely fronted by glass, each townhouse has three bedrooms with fitted wardrobes, two bathrooms of which one is en suite, guest toilet, spacious kitchen (not equipped) and bright open plan lounge _ dining room with a double_height ceiling. Outside there is large terrace which can be complemented by a private swimming pool at an additional cost (from 19,000 euros). Each house has a gated parking space. This new development is due to start construction during the autumn of 2017. The completion is expected in 18 months. _ Automatically post from InmoEnter _ Real Estate Management System.
Green 9 Cool, a new development with a functional and distinctive concept of design located at the eastern end of the Costa del Sol. This ultra_modern design is inspired as well by the surrounding nature and sports environment, right next to Baviera golf course, and just two minutes away from the beach and the Marina at Caleta de Velez. Designed over 2 floors to be completely fronted by glass, each townhouse has three bedrooms with fitted wardrobes, two bathrooms of which one is en suite, guest toilet, spacious kitchen (not equipped) and bright open plan lounge _ dining room with a double_height ceiling. Outside there is large terrace which can be complemented by a private swimming pool at an additional cost (from 19,000 euros). Each house has a gated parking space. This new development is due to start construction during the autumn of 2017. The completion is expected in 18 months. _ Automatically post from InmoEnter _ Real Estate Management System.